Tecnologia em Metalurgia, Materiais e Mineração
https://tecnologiammm.com.br/article/doi/10.4322/2176-1523.20222752
Tecnologia em Metalurgia, Materiais e Mineração
Artigo Original

Methodology to include the comminution specific energy into open-pit strategy mine planning using global optimization

Metodologia para incluir a energia específica de cominuição no planejamento estratégico de mina a céu aberto usando otimização global

Jônatas Franco Campos da Mata, Alizeibek Saleimen Nader, Douglas Batista Mazzinghy

Downloads: 2
Views: 572

Abstract

Strategic Mine Planning demands an accurate knowledge of the mineral deposit, being very important the use of block models supported by Geometallurgy. Currently, the methodology used considers the mine planning divided into parts (ultimate open pit, pushbacks, scheduling). Global optimization can guarantee the optimal solution once all steps are solved together. In the present study the database Marvin was used and the geometallurgical variable comminution specific energy was included. In the first scenario, called GeoMet1, a ramp-up was included in the first three years. In the GeoMet2, different maximum movement ranges were defined, as well as the implementation of ore stockpiles and their subsequent rehandling. Gains of 9.66% in NPV and 5.18% in ore production were found for GeoMet2. The second scenario presented ore production adhering to the programmed, in addition to greater stability in the stripping ratio. In addition, GeoMet2 was more efficient in controlling the comminution specific energy. Therefore, the implementation of mass movement limitations allied to the use of stockpiles favored the optimization of the mine scheduling results. It was possible to verify the importance of including the variable comminution specific energy in the block model, to provide more realistic and reliable results

Keywords

Mass stabilization; Stripping ratio; Strategic mine planning; Global optimization.

Resumo

O Planejamento Estratégico de Mina exige um conhecimento apurado do depósito mineral, sendo essencial a utilização de modelos de blocos apoiados pela Geometalurgia. Atualmente, a metodologia utilizada considera o planejamento subdividido em etapas (determinação da cava final, avanços de lavra, sequenciamento de mina). A otimização global pode garantir a solução ideal, uma vez que todas as etapas são resolvidas em conjunto. No presente estudo, utilizou-se o banco de dados Marvin, considerando a inclusão da variável geometalúrgica energia específica de cominuição. No primeiro cenário, denominado GeoMet1, foi incluído um ramp-up nos primeiros três anos. No GeoMet2, foram definidas diferentes faixas de movimentação máxima, bem como a implementação de pilhas de estoque de minério e seu posterior remanuseio. Ganhos de 9,66% no VPL e 5,18% na produção de minério foram encontrados para o GeoMet2. O segundo cenário apresentou produção de minério aderente ao programado, além de maior estabilidade na relação estéril/minério. Além disso, o GeoMet2 foi mais eficiente no controle da variável energia específica de cominuição. Portanto, a implementação de limitações de movimentação de massa aliada ao uso de pilhas de estoque favoreceu a otimização dos resultados de sequenciamento de mina. Foi possível verificar a importância da inclusão da energia específica de cominuição no modelo de blocos, para fornecer resultados mais realistas e confiáveis.

Palavras-chave

Estabilização de massas; Relação estéril/minério; Planejamento estratégico de mina; Otimização global.

Referências

1 Lerchs H, Grossmann IF. Optimum design of open pit mines. In: Joint CORS and ORSA Conference; 1965; Montreal. Montreal: Transactions CIM; 1965. p. 17-24.

2 Whittle D, Whittle J, Wharton C, Hall G. Strategic mine planning. 8th ed. Vancouver: Gemcom Software International Inc., 2005.

3 Johnson TB. Optimum open pit mine production scheduling. Berkeley: Operations Research Department, University of California, 1968, p. 120.

4 Ota RRM, Martinez LA. SimSched Direct Block Scheduler: A new practical algorithm for the open pit mine production scheduling problem. In: Conference APCOM 2017; 2017; Colorado. Colorado: APCOM; 2017. v. 38.

5 Macfarlane AS, Williams TP. Optimizing value on a copper mine by adopting a geometallurgical solution. Journal of the Southern African Institute of Mining and Metallurgy. 2014;114(11):929-935.

6 Morales N, Seguel S, Cáceres A, Jélvez E, Alarcón M. Incorporation of geometallurgical attributes and geological uncertainty into long-term open-pit mine planning. Minerals. 2019,9(2):108. http://dx.doi.org/10.3390/min9020108.

7 Haller M. Cycle time management during production ramp-up. Robotics and Computer Integrated Manufacturing, 2003;19:183-188.

8 Mohr SH. Projection of world fossil fuel production with supply and demand interactions [thesis]. Newcastle: The University of Newcastle. 2010.

9 Maher DR, Medini K. A preliminary overview of ramp-up management practices in crisis context. In: APMS 2021: Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems; 2021; Nantes, France. Korea: APMS; 2021. p. 484-492.

10 Hustrulid W, Kuchta M. Open pit mine – Planning & design. 2nd ed. Rotterdam: Balkema; 2006. v. 1.

11 Wyllie DC. Rock slope engineering: civil and mining. 5th ed. Boca Raton: CRC Press; 2017. 568 p.

12 Marndi B. Stability of slopes in iron ore mines [thesis]. Rourkela: Deemed University; 2011.

13 Abdellah WR, Hirohama C, Sainoki A, Towfeek AR, Ali MAM. Estimating the Optimal Overall Slope Angle of Open-Pit Mines with Probabilistic Analysis. Applied Sciences (Basel, Switzerland). 2022;12:4746. http://dx.doi.org/10.3390/app12094746.

14 Miola W. The case for the homogenization of stockpiles. Brasil Mining Site; 2022 [cited 2022 Oct 5]. Available at: brasilminingsite.com.br

15 Prasojo TS, Yulianto A, Hindarto A, Parinussa B, Arifien A. Ore blending as mine scheduling strategy to accommodate resources conservation at pakal nickel mine, PT ANTAM (Persero) Tbk. Procedia Earth and Planetary Science. 2013;6:24-29.

16 MiningMath®. MiningMath’s Knowledge Base. 2021 [cited 2021 Nov 10]. Available at: https://knowledge.miningmath.com/

17 Espinoza D, Goycoolea M, Moreno E, Newman AN. MineLib: a library of open pit mining problems. Annals of Operations Research. 2012;206(1):91-114. [cited 2012 Nov 1]. Available at: http://mansci-web.uai.cl/minelib/18 Mata JFC, Nader AS, Mazzinghy DB. Inclusion of the geometallurgical variable specific energy in the mine planning using direct block scheduling. Tecnologia em Metalurgia, Materiais e Mineração. 2022;19:e2677.

19 Borges TC. Análise dos custos operacionais de produção no dimensionamento de frotas de carregamento e transporte em mineração [dissertação]. Ouro Preto: Universidade Federal de Ouro Preto; 2013.

20 Zhang K, Kleit AN. Mining rate optimization considering the stockpiling: a theoretical economics and real option model. Resources Policy. 2016;47:87-94.


Submetido em:
20/07/2022

Aceito em:
10/11/2022

63922651a953952f64148e74 tmm Articles
Links & Downloads

Tecnol. Metal. Mater. Min.

Share this page
Page Sections